Question.
While taking over a
new ship in shipyard, as a chief engineer elaborate your inspection/checks and
significance of the following.
Governing
factors for having optimum stability in both static and dynamic categories.
Intact
stability criteria that new ship required to fulfil.
Effect
of draft on righting arm.
Cross curves of
stability.
Free communication
effect [stability changes that occur when off center
compartment is in free communication with the sea.]
Question.
(a) Develop generic framework of a Shipboard
Energy Efficiency Management Plan (SEEMP) for an existing ship and justify that
it is an effective tool for improving commercial viability of ship operations
than a mere regulatory measure.
(b) Describe the process
for calculating 'required EEDI' and 'attained EEDI' of a new container ship.
(c) Explain how the
'attained EEDI' can be validated and suggest ways to improve the attained EEDI,
should the need arise.
Question.
What are human
related factors taken into account as potential risk factors in a risk
assessment on ships?
Name three such
human related risks and possible risk mitigation measures that could be taken
for each of them.
You are a chief
engineer on a 60,000 DWT bulk carrier.
Your ship had a
major breakdown of the main engine turbocharger and repairs are not possible on
board.
Without the
functional turbocharger, your vessel is unable to make more than 4 Knots speed.
In consultation with
the Master, you are contemplating diverting to the
Explain how you
would do a risk assessment to evaluate the risk of engine failure during the
approach.
Question.
Elaborate the
objectives and the requirements of Hong Kong International Convention for the
Safe and Environmentally Sound Recycling of Ships, 2009.
Question.
The vessel in which
you are the c/e is about to be laid up for 3 months for commercial reason
All equipment and
machinery on board require to be preserved during lay up period for recommissioning when required.
Describe the action
you will take as c/e to prepare the main propulsion diesel engine for
preserving during lay up period.
Question.
Regarding Ballast
Water Management Convention explain
(a) Ballast Water
Exchange Standard
(b)Ballast Water
Performance standard
(c) Treatment
methods for ballast water
(d)Approval methods
for treatment system using active and non-active substances
(e) What are the marine pollution problems related to port
development such as ballast water, dredging and spills from ships
Question.
Explain the
following maritime term: (a) Charter Party (b) Freight (c) Bare Boat Charter (d)Bill of Lading (e) Lay Time, Demurrage and Off-Hire.
Question.
(a) Onerous Tax
Regimes, Multiplicity of Regulations, Quality Manpower Shortage, High Port
Calling Costs, Congestion in Ports and Lack of connectivity with Hinterland
etc., are projected as the major impediments for the growth of coastal shipping
in
(b) The `Sagar Mala Programme' is an
initiative by the government of
Question.
As Chief Engineer
Officer, explain how you will prepare vessel for dry docking.
Your answer should
also include all the required items that you will ensure/procure when vessel is
planned for dry docking.
Outline the
essential information to be supplied to the dry dock management prior to dry
docking a vessel.